The greener it can get

November 29, 2013

times

The greener it can get

Friday, November 29, 2013, 

Alfred E. Baldacchino

The Rural Development Programme 2014-2020 which will eventually be submitted to the European Commission for funding, was discussed at a public consultation earlier this month.

Consulttion Document cover

The synopsis presented contains positive ideas. The full report was not available being ‘a long and detailed document’ and ‘not easy to use for public consultation’. This greatly hindered more indepth suggestions and comments. Could it not have been uploaded on the department’s website?

The synopsis is based on the strengths, weaknesses, opportunities and threats of rural development based on five themes, with objectives and activities for funding.

Theme 1 deals with water, wastes and energy.
Can water be managed in the absence of a national water policy? The present fragmented ‘management’ reveals a ministry digging a tunnel to channel rain water directly to the sea. Another purifying sewage water and dumping it in the sea. A corporation managing and distributing potable water while a secretariat is trying to plug holes and mend cracks in water reservoirs and cisterns.

Such lack of coordination and waste of financial resources, most of which are coming from the EU, does not augur well. This was also pointed out by the representative of the Malta Water Association during the public consultation, adding that lack of access to the original draft report restricts discussions.

Activities suggest investment “in water management, abstraction…” Does this mean that abstraction will be funded when this is being tackled by another ministry trying to control and regulate it?

Theme 2 deals with Maltese quality produce, highlighting the need for quality assurance, poor enforcement of regulations and support for adding value as the major opportunities. The GMOs Pandora’s Box that farmers and consumers are being offered and possibly swallowing and the ever-increasing public rejection of GMOs can be capitalised upon by the farming community. Not only was this not even referred to but a farmer’s representative was heard saying that farmers cannot do without GMOs!

Theme 3 refers to sustainable livestock.
A positive item under activities to be funded is the support “for activities that reduce livestock farms’ impact on the climate and environment”. This can perhaps address the issue of past EU funds used to build such livestock farms on sensitive water table areas, rendering the water so nutrient rich and unusable.

Theme 4 deals with landscape and the environment.
The objectives are great and the wording is even nicer. But this is another subject where fragmentation reigns supreme.

Landscaping is under the responsibility of the Ministry for Transport where the main driving force is devoid of any ecological input. Mepa is the competent authority (on paper) under the responsibility of the Prime Minister’s Office. It is no secret that Mepa has rarely raised a finger to protect any tree and often turns a blind eye to all mutilation, uprooting, chemically-killed trees and introduction of alien species.

Local councils, under the responsibility of the Ministry of Tourism, go on a rampage ‘pruning’ trees with no questions asked.

The reply to my question as to who will be the regulator in such landscaping was no reply at all, sending shivers down my spine. The sanest political, technical, administrative, ecological, economical, legal way forward is that the regulator has to be the Minister for the Environment. This will ensure that there will not be any cow itch trees, fountain grass, flame trees et al. or turf growing in rural areas. And EU funds will be used in line with EU obligations, not as has happened in the past.

The economic bias of such a
report completely dwarfs the
sensitive ecological obligations

The funding of “new skills and knowledge (that) will be required in terms of landscape management, ecological understanding, conservation and practical skills” is a good idea if well managed and executed professionally.

The maintenance and restoration of rubble walls brought a rumble of disappointments by many who have been waiting for five and more years to restore the breach in their rubble walls. Breaches in rubble walls contribute to soil erosion, which fills valleys, and eventually is carried out to sea. Cannot photos and videos record such breaches to allow their immediate restoration and then farmers be reimbursed by the RDP?

rubble wall builder - The Times

Breaches in rubble walls contribute to soil erosion, which fills valleys, and eventually is carried out to sea (Photo: The Times)

A one day’s wait, especially during the rainy season, is too long for this fragile environment, resulting in ecological and additional expenses.

The wider rural economy and quality of life are addressed under theme 5
Among the objectives listed is the development of bed-and-breakfast business, which is also a good objective. However, if its implementation does not encompass the ecological impact it can be bizarre in such a small island State, the more so when experts and representatives involved in such activity omit biodiversity experts and the Ministry for the Environment, whether by conviction or for convenience.

The unnumbered delivery section outlines other actions, including ‘valley management/landscape management partnerships’ and a ‘rural resource hub’.

The first is urgently necessary even from an ecological point of view but, God forbid, if this is executed on the lines of past years without any holistic professional input but just by bulldozing earth to temporarily please the eye and inflict ecological damage.

The ‘rural resource hub’ is also welcome and can fill the void and neglect so conspicuous during the last decade. The once beneficial government experimental farm has, during the last years, been used more by domestic cats, dogs and pets. The once experimental farm can help educate, train, give technical knowledge advice and hands-on experience to all stakeholders in rural development.

These are but a few reflections and suggestions on the abridged consultation document, without having access to the original draft and keeping in mind that “precise details may well change over the next year, as discussions and agreement are still being developed in Brussels”.

Unfortunately, the economic bias of such a report completely dwarfs the sensitive ecological obligations. The outline nonetheless contains important and useful points that can contribute to rural development and Maltese biodiversity with some dotting of the i’s and crossing of thet t’s.

aebaldacchino@gmail.com
alfredbaldacchino.wordpress.com
Alfred E. Baldacchino is a former assistant director at Mepa’s environment directorate.

Advertisements

A vision buried at Nadur cemetery

April 6, 2013

times

Saturday, April 6, 2013

A vision buried at Nadur cemetery

Alfred E. Baldacchino

The Archpriest of Nadur applied for the development of a cemetery on May 20, 2002. An outline development permit was issued on January 28, 2004 and a full development permit, valid for five years, was granted by the Malta Environment and Planning Authority on May 31, 2007. An appeal was submitted by Nature Trust on July 16, 2007 and works on the cemetery started in summer of that same year.

2012.10.00 - works in progress while the appeal keeps being postponed

Work in progress on the cemetery while the appeal board deliberated

The following documented data was made available to the Appeals Board: The development is in an ODZ (outside development zone).

There never was any public consultation.

EU Water Framework Directive obligations regarding ground water were not taken in consideration.

The locality is designated as an area of high landscape sensitivity and a land of agricultural value according to the Gozo and Comino Local Plan.

Technical staff at Mepa repeatedly recommended a refusal for such development.

Refusal was also recommended by the planning authority’s Heritage Advisory Board.

The proposed cemetery lies within the catchment area of one tributary that feeds Wied Għajn Qasab, one of the most important in Gozo.

This 6,500-square-metre cemetery footprint is on upper coralline limestone (garigue), overlying blue clay that contributes to a perched aquifer covering 5.6 square kilometres, “filtering on a good rainy season 16,000 gallons (73,000 litres) of potable natural water daily at Għajn Qasab springs”.

It is estimated that the recharge of water through percolation or infiltration amounts to 785,109 cubic metres annually.

The water catchment area around the cemetery covers 33,000 square metres.

The rock formation contains various faults, crevices and fissures, which channel rainwater to the farmers’ cisterns.

The fields dependent on the aquifer have been used for agricultural purposes for hundreds of years.

The engineering works regarding water use and storage, including bell shaped wells, galleries, channels and cisterns, date back to the time of the Knights of St John. Such network has been physically destroyed or rendered nearly useless by the cemetery.

The report by the geologist appointed by the developer, indicated that the project is unlikely to have an adverse impact on the water resources.

No hydrologist’s report was ever submitted.

The precautionary principle, a guiding principle in the EPA 2011, was completely ignored. The developer reports that the cemetery plans to cater for 643 graves, despite the fact that only 50 persons die annually in Nadur, some of whom are buried in the old cemetery.

The commercial value of the cemetery’s footprint estimates each grave at €4,000 at the time of the submisison of the appeal in 2007, showing the commercial vision of the project.

A number of letters were officially, personally and publicly written to the Prime Minister and to the minister responsible for the environment.

A number of social entities, farmers and the public expressed disapproval both of this development and of the way it was being handled.

The appeal case was heard and postponed for 19 times and, finally, a decision date was appointed for September 27, 2012, only to be postponed again.

The legal representative of the farming community wrote to the Environment and Planning Review Tribunal, emphasising that postponing the decision was jeopardising the interests of the farmers.

A hydrological report by Marco Cremona was eventually presented to the Appeals Tribunal. The study clearly states that there is no doubt about the direct hydraulic connection between the site of the cemetery and the farmers’ water source.

Affidavits by affected farmers show that, before the work on the cemetery, they had enough water for their fields. However, when the works got under way, they had to buy water for their fields and products decreased in quantity and quality.

On March 15, 2013 – the ides of March and six days after the last election – the Environment and Planning Review Tribunal informed the objectors that the original permit dated May 31, 2007 was superseded by another permit dated July 23, 2012, where the applicant presented an amended application to the original permit.

Since there was no appeal to the latter permit, the original one was now exhausted, having been superseded by the latter. Because of this, the tribunal abstained from taking further notice of the appeal.

Mepa’s vision “is to pass onto our children a better country than we inherited. It is for this very reason that we (Mepa) compare our environment to a treasure, something we dedicate our energies to, to protect, care for and improve. The environment encompasses all – nature, cultural and architectural heritage, towns and villages, the countryside, the seas and air. We (Mepa) believe that together we should carefully plan so that our heritage, this gem that we treasure, will not fade away.”

Who can possibly believe this when Mepa buried its vision at the Nadur cemetery?

2009.02.00 - The remains of a protected carob tree

The water catchment area of garigue which replenished the perched aquifer feeding and supplying water to the farming community and the valley ecosystem – BEFORE the approved rape of the ecosystem started.

Was this cemetery, to be run on a time­share basis, really needed in Nadur? Why was the precautionary principle not applied in such a sensitive and delicate ecological area with such a rare natural resource? Why where the above social and ecological negative impacts all cast aside, importance being given only to economic aspects? Was ‘the hand of god’ coerced to give the green light for such an injustice?

Jesus once entered the temple area and drove out all traders and shoppers. He overturned the tables of the money changers and the benches of those selling doves. What would He have done had He found the selling of graves in His name? It is easier to deliver 10 sermons than to live one.

“Our lives end the day we become silent about things that really matter”…“and, in the end, we will remember not the words of our enemies but the silence of our friends” (Martin Luther King).

2009.06.01 water from the acquifer

The murky water feeding the farmers’ cisterns after the work started – definitely not the clear pure potable water they were used to use before.

The dead at Nadur cemetery will haunt and curse the living.

For God’s sake, remove environmental matters from Mepa before the social and ecological fabric of these islands is completely destroyed.

aebaldacchino@gmail.com

alfredbaldacchino.wordpress.com

The original article in The Times, with comments posted by readers, can be seen at the following link:

http://www.timesofmalta.com/articles/view/20130406/opinion/A-vision-buried-at-Nadur-cemetery.464394


The garden at Salina park

February 9, 2013

times

Friday, February 8, 2013

by Alfred E. Baldacchino

A report was carried in The Times on the extension of the “landscaped gardens in Salina park” (January 14).
Such projects can be very beneficial if they are accomplished with in-depth planning and management. I have gone through the project description statement (PDS) submitted for the extension. Unfortunately, the document lacks important data to enable support for such a project.
Nonetheless, with some suggestions and comments, such a ‘garden’ can achieve its aims without any negative social and ecological impacts.
Let’s start with water. Although the use of water can contribute to the natural environment of the park in a number of ways, be they aesthetical, ecological or social, one has to keep in mind and emphasise that water is a scarce resource.
The PDS refers to “water features” without any indication of what these actually   are. Keeping in mind the recent obsession with ‘water fountains’, one cannot be  blamed for thinking that these are some of the features referred to, which, in some cases, are completely unsustainable.
The PDS also refers to a new dug ‘water cistern’, which is slightly larger than half the size of the proposed underground space for a “pump room and services”. The water storage for use in watering trees and for the ‘water features’ is definitely not adequate, as indicated by the need of a ‘water
tanker for filling in the water reservoir’.
There is also no indication of why the water cistern in question is so small when there is so much flood water being channelled to the sea and the sewer system. The pull-quote in The Times report – “A long stretch of stream will refresh the atmosphere” – is quite inappropriate, considering the local precarious water situation because this can also hole a number of public pockets. How sustainable is the use of such a scarce resource as suggested in the PDS?
There is then the issue of trees. The PDS indicates areas where new trees are to be planted but there is no data whatsoever on such trees. To better enable more comments, suggestions and support for the project, additional information is needed, such as: the species of trees to be used; whether the trees are indigenous or exotic; whether the supply of trees is to be obtained from local stock or imported; whether there are plans to implement the Government’s obligations in contributing to the European Union loss of biodiversity campaign by utilising endangered or rare indigenous trees propagated from local stock and adequate to such a habitat; whether the
new ‘garden’ will be according to the guidelines of the National Environment Policy, the Flora, Fauna and Natural Habitats Protection Regulations, 2006, the Trees and Woodlands Protection Regulations, 2011 and other related national and EU obligations with regard to the protection of biodiversity.
There is absolutely no reference to this at all in the PDS and, considering the way that ‘landscaping’ is mentioned in the proposal, it makes it a bit more difficult to support such a project given such lack of important data.
Another consideration is use of electricity. The PDS refers to the need of electricity for ‘pedestrian lighting’ but, again, there is no indication or line drawings of how this lighting will be used and controlled. This ‘park’ or ‘garden’ will, no doubt, become a natural habitat for nocturnal fauna but there is no mention of mitigation measures of how these would not be disturbed. More data is also needed to enable both the public and environmental groups to comment on the use of the planned ‘pedestrian lighting’.

With regard to the management of the site, annex 1 (reference to figure 2: aerial view – photographic survey) attached to the PDS, shows that, in certain areas, some of the trees are planted too close to each other, thus preventing the proper growth of a tree canopy. This can lead one to conclude that either the site is not properly managed or else that the number of trees planted is more important than the final grove itself.
Such crowded trees will necessitate future thinning and this is a waste of resources (financial, human, and ecological), especially where the trees involved cannot be replanted, such as the Pinus species.

Such a ‘garden’ in the ‘park’ (I cannot understand the need for such a distinction in this context) has to have a management plan but none is mentioned in the PDS. One has to see what conditions the Malta Environment and Planning Authority comes up with in connection with the permit, such as use and management of a managed natural habitat. Not that I am very optimistic because where government projects are involved, Mepa unfortunately uses the same rubber stamp.
No one would like to be led up a garden path for a walk in the park.
aebaldacchino@gmail.com
alfredbaldacchino.wordpress.com


Iċ-Cimiterju f’Għajn Qasab, in-Nadur Għawdex

November 1, 2012

Iċ-Cimiterju f’Għajn Qasab, in-Nadur Għawdex

Alfred E. Baldacchino

L-Erbgħa, 31 ta’ Ottubru, 2012

Il-kontroversja taċ-ċimiterju f’Għajn Qasab, in-Nadur Għawdex ilha għaddejja issa mhux ħażin. Saħansitra sar appell lill-MEPA dwar il-permess li din ħarġet lill-Arċipriet tal-Knisja tan-Nadur. Il-MEPA ilha issa mhux ħażin tistudja u tistudja, u tistudja u tistudja dan l-appell u tipposponi u tipposponi d-deċiżjoni tagħha minn xahar għal xahar.  Sadanittant, ix-xogħol fuq dan iċ-ċimiterju għadu għaddej. Forsi xi ħadd għandu xi pjan biex ix-xogħol fuq dan iċ-ċimiterju jilħaq jispiċċa u d-deċiżjoni tal-Bord tal-Appell tal-MEPA tkun tista’, mal-ftuħ uffiċjali ta’ dan iċ-ċimiterju, tagħmel l-ewwel difna fih billi tidfen id-deċiżjoni tal-appell.

Għelieqi u x-xagħri jinbidlu f’ċimiterju waqt li x-xogħol u l-appell għaddejin id f’id!

Sadanittant, il-bdiewa li jiddependu mill-ilma li kienet tilqa’ l-art li tħaffret biex jinbena dan iċ-ċimiterju, u lil kien jintua biex isaqqu l-uċuħ tar-raba’ tagħhom, fejn hemm mijiet tas-siġar taċ-ċitru, għadhom imħassba għal dan id-dewmien ta’ deċiżjoni li qed taffettwalhom xogħolhom u l-għixien tagħhom.

Illum deher artiklu fuq il-blog tal-Perit Carmel Cacopardo dwar dan iċ-ċimiterju, liema rapport qiegħed ninkludu hawn, flimkien ma’ xi kummenti li dehru.

Il-Kappillan jagħtiha għall-business

Carmel Cacopardo – 31 10 2012

F’Għajn Qasab limiti tan-Nadur Għawdex l-inkwiet għadu għaddej. L-Kappillan tan-Nadur qed jagħmel biċċa business bl-oqbra. Business li wiret mill-Kappillan ta’ qablu. Qaluli li hu speċi ta’ timeshare bl-oqbra.

Ix-xogħol ta’ kostruzzjoni għaddej u l-ħsara lill-biedja fl-inħawi m’hiex żgħira. Is-sistema ta’ irrigazzjoni li ilha taħdem minn żmien il-kavallieri ġiet imħarbta biex il-Kappillan jagħmel il-business bl-oqbra. Sa minn żmien il-kavallieri missierijietna kienu għaqlin biżżejjed biex fasslu sistema li iżżomm l-ilma u titilqgħu ftit ftit. Hekk li meta tagħmel ix-xita l-ilma jinħażen u matul is-sena sa Awwissu u anke Settembru titlaq dan l-ilma ftit ftit. Dan l-ilma għal dawn l-aħħar tlett mitt sena intuża biex f’Għajn Qasab hemm qasam kbir mimli siġar taċ-ċitru. Issa l-ilma naqas. Jiġi f’daqqa malli tagħmel ix-xita u wara ftit li xejn.

L-effetti fuq il-bdiewa ġja bdew. Raba’ mingħajr ilma matul is-sena bil-fors tnaqqas il-frott li trodd.

Il-Kappillan inkwetat. Mhux għall-bdiewa u l-għixien tagħhom li hu mhedded. Hu inkwetat li l-appell fil-MEPA kontra l-bini taċ-ċimiterju għadu għaddej u ma jafx meta ser ilesti. Min tah il-flus għall-oqbra qed igorr.

Jiena infurmat li din il-ġimgħa dawk viċin il-kappillan bdew jiġbru l-firem. Lin-nies qalulhom li dwar il-permessi għad hemm il-problemi. Imma li l-business tal-Kappillan qed jagħmel il-ħsara lill-bdiewa ħadd ma qalilhom xejn dwaru.

Dwar dan messu jitkellem Dun Mario!

http://carmelcacopardo.wordpress.com/2012/10/31/il-kappillan-jaghtiha-ghall-business/?replytocom=1779#respond

2 responses

 Mario Xerri 31 10 2012 (19:21:05) :

Din hija s-sena tal-FIDI ghalina l-INSARA. Din il-fidi f’ALLA qieghda tigi mtappna b’hafna skandli madwar id-dinja specjalment gewwa l-EWROPA. Il-hasra hi li l-knisja kattolika kellha sehem ukoll. Dan li qieghed jigri go GHAWDEX ma jghinx! Il-bniedem jitwieled b’xejn minn guf ommu……fl-ahhar ta’ hajtu ma jiehu xejn mieghu.

Baldacchino Alfred E.    31 10 2012 (20:16:01) :

APPARTMENTI GĦALL-MEJTIN

Prosit Carm, tajba ħafna.

Immisna nibdew petizzjoni aħna wkoll u niġbru l-firem biex nibgħatuhom kemm lill-Knisja, lill-Gvern, lill-Opposizzjoni u anki lill-Vatikan. Jidher li fejn jidħlu l-flus hawn Malta mhemm l-ebda kuxjneza soċjali u ekoloġika, sfortunatament lanqas fil-Knisja. It-twemmin nisrani jiġi wara.

Darba kont ktibt li għad jiġi żmien meta l-mejtin għad jisħtu l-ħajjin dwar iċ-ċimiterju tan-Nadur f’Għawdex. Nixtieq nara minn sejjer inaqqax ismu fuq l-irħama meta jinfetaħ dan iċ-ċimiterju. Naħseb li jrid ikun hemm irħana kbira mhux ħażin għaliex dawk li taw sehomhom huma ħafna bħal ngħidu aħna, id-djoċesi ta’ Għawdex, Il-Gvern, l-Oppożizzjoni, il-Mepa, dawk li tħallsu biex għamlu r-rappport li jiġġustifika dan l-isfreġju tal-ambjent. U mhux biss l-isem tal-entitajiet fejn warajhom jinħbew in-nies responsabbli, imma ismijiet ta’ minn huma dawn in-nies. Il-Kappillan tan-Nadur naħseb li jikkwalifika biex ikun fuq ras il-lista.

Wasalna fi stat redikolu issa li qed nibnu appartamenti għall-mejtin u l-ħsara ta’ deċiżjonijiet bħal dawn iħallsuhom is-socjetà u l-ambjent.

Lapida li tixraq lil dan iċ-ċimiterju f’Wied il-Qasab, in-Nadur Għawdex.

Ara l-artiklu tiegħi hawn

https://alfredbaldacchino.wordpress.com/2010/06/21/the-nadur-cemetery-%E2%80%93-where-the-dead-will-haunt-and-curse-the-living/


Qerda tal-biodiversità fil-foss tal-Imdina… biex isir ġnien ta’ kwalità!

September 28, 2012

Dan l-aħħar qrajna u smajna stqarrijiet minn Ministru tal-Gvern dwar ġonna ta’ kwalità u spazji miftuħa għall-familji.

Meta wieħed jaqra u jisma’ l-kummenti ta’ dan il-Ministru tal-Gvern li huwa responsabbli minn dawn il-proġetti, wieħed mill-ewwel jifhem għaliex illum il-qerda tal-ambjent naturali hija daqstant kbira. U wieħed ma jistax ma jistaqsiex numru ta’ misoqsijiet, bħal ngħidu aħna:

  1. Bliema immaġinazzjoni jista’ xi ħadd jgħid li sejjer jagħmel ġnien ta’ kwalità u fl-istess ħin jaqla’ u jeqred ammont kbir ta’ sigar b’impatt kbir fuq il-biodiversità tal post?  (ara ritratti aktar l-isfel).
  2. Kif jista’ wieħed jgħid li sejjer jagħmel ġnien ta’ kwalità u fl-istess ħin jiksi l-post b’medda wiesgħa ta’ konkos; konkos aktar milli hemm u aktar milli kien hemm siġar qabel ma beda x-xogħol? (ara ritratti aktar l-isfel)
  3. Liema raġuni xjentifika tiġġustifika li biex isir ġnien ta’ kwalità titqaxxar u tinqered il-liedna kollha li kien hemm fil-post u li kienet tħaddar u tiksi metri kwadri kbar tal-ħajt tal-ġnien Howard Gardens (mhux mal-ħajt tas-sur) u li kienet toffri ambjent naturali għall-numru ta’ fawna indiġena? Din kienet ukoll issebbaħ u tgħati l-ħajja lill-kull ġnien anki jekk mhux ta’ kwalità. U dan minkejja li l-Gvern ta’ Malta huwa obbligat u marbut mill-Unjoni Ewropea biex jara li jieħu miżuri biex ma tkomplix tinqered il-biodiversità tal-Unjoni Ewropea li aħna parti minnha. Il-Ministri tal-Ambjent (anki dawk li jgħidu li xi darba kienu Ministri tal-Ambjent) din kollha jafuha, kemm mid-dokumenti tal-UE li jirċevu, kif ukoll mill-laqgħat tal-Kunsill tal-Ministri li jattendu.

Fid-diskors tiegħu fil-video li deher fil-ġurnal The Times

http://www.timesofmalta.com/articles/view/20120918/local/mdina-ditch-being-transformed-into-quality-garden.437446

dan il-Ministru qal li ma nqerdux siġar.  Jekk wieħed iħares lejn ir-ritratti hawn mehmuża, waħdu jasal f’konklużjoni waħda.

  1. Kif jista’ xi ħadd jgħid li dan ix-xogħol qed jerġa jieħu dan il-post għall-ġranet passati tal-glorja tiegħu?  Sa fejn naf jien fi żmien l-Għarab u l-Kavallieri ma kienux jużaw konkos (sakemm xi perit ma jikkoreġinix!) li llum huwa l-aktar ħaġa li tispikka f’dan il-ġnien (u ġonna oħra simili) ta’ kwalità. Lanqas kienu jiżirgħu turf  għax l-ilma għalihom kien jiswa mitqlu deheb, u lanqas kienu jagħmlu ilma ħiereġ jiżfen mill-art!  U lanqas ma kienu jużaw lift biex jinżlu mis-swar għall-foss. Jidher li l-Għarab u l-Kavallieri li ħakmu pajjiżna tant għexieren ta’ snin ilu, kellhom viżjoni ferm u ferm aktar professjonali, ekonomika, soċjali, ambjentali u sostenibbli milli għandhom il-mexxejja politiċi Maltin tal-lum, minkejja li dak iż-żmien ma kienx hemm obbligi ambjentali internazzjonali bħal ma għandna llum u lanqas kellhom Ministri tal- Ambjent.
  2. Ir-Rabtin u l-ġirien tagħhom  ma għandhomx bżonn xi politku li ma għandu l-ebda idea ta’ xi tfisser biodiversità biex jgħamillhom ġnien ta’ kwalità! U lanqas għandhom bżonn spazji miftuħa għall-familji għax għandhom biżżejjed spazji miftuha. Żgur li ma għandhomx bżonn ta’ spazju miftuħ ġo foss. U jekk kien hemm il-ħsieb li dan il-foss jinfetaħ għal kulħadd, kull ma kien hemm bżonn kien  li jitneħħew il-katnazzi li kienu jsakkru l-bibien li jgħalqu l-aċċess għal kulħadd. Li kieku dan id-diskors jintqal lill-kostitwenti ta’ min qalhom, li llum huma ferm u ferm konxji mill-ambjent naturali u l-qerda li l-konkos qed jagħmel lil dan l-ambjent, żgur li kienu jibgħatuh jistgħad biex forsi jaqbad xi mazzun!
  3. Imma veru li biex tagħmel ġnien ta’ kwalità illum l-ingredjenti huma: a) konkos; b) turf; c) ilma jiżfen; d)  issa anki lift; u e) l-qerda tal-biodiversità tal-post kollha, kif sar fil-foss tal-Imdina u f’kull hekk imsejjaħ ġnien ieħor li qed isir mill-istess ministeru?
  4. Ħarsa lejn il-kummenti li kien hemm fil-gazzetti f’dawn il-links

http://www.timesofmalta.com/articles/view/20120918/local/mdina-ditch-being-transformed-into-quality-garden.437446

http://www.timesofmalta.com/articles/view/20120919/local/Mdina-ditch-returned-to-glory.437501

u fir-ritratti li ħadt jien stess u li wħud minnhom jidhru hawn taħt, kollha jitkellmu u juru  d-disastru li sar bi flus pubbliċi u b’dawk tal-Unjoni Ewropea.

  1. Forsi hawnhekk ta’ minn jistaqsi minn qed jamministra l-fondi tal-UE, f’dan il-kas il-European Regional Development Fund?  Min qiegħed jawditjahom? Fejn jista’ l-pubbliku jara rendikont tal-infiq?
  2. Barra minhekk, minn qiegħed jara li jkun hemm diskussjoni pubblika fuq il-proġetti biex b’hekk ikun involut iċ-ċittadin fid-deċiżjoni, qabel jintefqu dawn il-flus? Dan ukoll huwa fost l-obbligi li titlob l-UE.
  3. Jiddispjaċini ngħid li l-ħsara li qed issir lill-biodiversità Maltija bi proġetti bħal dawn, bi skuża ta’ ġonna ta’ kwalità u spazji miftuħa għall-familji, trid aktar minn ġenerazzjoni biex titranġa.
  4. Dan il-ġnien sejjer ikollu kwalità waħda …. dik ta’  mafkar ta’ kif l-ambjent naturali qed jiġi sfruttat u mżeblaħ f’dawn l-aħħar snin, mingħajr ebda mistħija u ebda mgħodrija.
  5. Fl-aħħarnett min huma l-konsulenti tal-Ministru li huwa responsabbli biex jaraw li dan ix-xogħol ikun wieħed sostenibbli, jiġifieri li ma ssirx ħsara ekonomika, ħsara soċjali u ħsara ekoloġika kif qed issir?
  6. Nismagħhom jgħidu li hawn Malta kollox possibli, imma ma naħsebx li hawn xi ħadd li sab kif jgħatti x-xemx bl-għarbiel, għalkemm hawm min qed jipprova u qed jagħmel ħiltu kollha.

ARA WKOLL

http://www.orizzont.com.mt/Issues/19092012/social/article95864.html

http://www.timesofmalta.com/articles/view/20120918/local/mdina-ditch-being-transformed-into-quality-garden.437446

http://www.timesofmalta.com/articles/view/20120919/local/Mdina-ditch-returned-to-glory.437501

http://alfredbaldacchino.wordpress.com/2012/05/25/environmentali…ent-over-trees

https://alfredbaldacchino.wordpress.com/2012/07/31/once-there-were-green-leaves/

https://alfredbaldacchino.wordpress.com/2012/04/30/massacre-of-md…eally-involved/

https://alfredbaldacchino.wordpress.com/2012/02/27/government-policy-on-trees/

iL-BIODIVERSITA’   SINJURA TA’ QABEL BEDA X-XOGĦOL FIL-FOSS TAL-IMDINA U L-KWALITA’ TA’ QERDA LI SARET MINN META BEDA X-XOGĦOL FUQ IL-ĠNIEN TA’ KWALITA’

QABEL – Ringiela ta’ siġar taċ-Cipress li kienu jiffurmaw parti mill-biodiversità

WARA – L-unika siġra taċ-Cipress li baqa’ – MEJTA. L-oħrajn kollha nqalgħu u nqerdu. Ikun interessanti kieku l-esperti tal-Ministru jgħidulna kif mietet din is-siġra, jew aħjar jekk inqatletx b’xi kumbinazzjoni!  Ma naħsebx li issa sejjer ikun hemm xi ħadd li tniggżu l-kuxjenza biex jaqla’ siġra mejta, meta nqalgħu tant u tant siġar ħajjin minn dan il-post .

QABEL – ambjent naturali sinjur

WARA – parti mill- ġnien ta’ kwalità – anqas biodiversità, aktar konkos!

WARA – liedna  meqruda fil-ġnien ta’ kwalità

WARA – siġar taċ-Ċipress maqlugħa, meqruda  u mitfuha fl-art biex jagħmlu wisa għall-ġnien ta’ kwalità.

WARA – fdalijiet tas-siġar mejta taċ-Ċipress taħt it-tabella tal-Ministeru li qed jagħmel ġnien ta’ kwalità

QABEL U WARA – id-dehra tal-foss ftit wara li beda x-xogħol fuq il-ġnien ta’ kwalità.  Is-siġar immarkata b’salib isfar kollha ġew meqruda, jew maqlugħa.

WARA – post għeri mill-biodiversità fi ġnien ta’ kwalità fejn jispikka l-konkos u l-għibien tas-sigar li qabel kienu jżejnu dan il-post.

It-tabella imwarrba u mitluqa fl-art li madankollu turi l-għajuna finanzjarja li qed tgħati l-EU mill-European Regional Development Fund, għar-restawr tal-post, li qed isir fost oħrajn bit-tneħħija tal-biodiversità u kisi bil-konkos.


Environmentalists vs government over trees

May 25, 2012

Friday, May 25, 2012 

Report: Kristina Chetcuti
Video: Mark Zammit Cordina

Environmentalists vs government over trees

The bastions of Mdina seem to be the setting for a battle scene once again. The dissent, this time round, concerns the rehabilitation of the ditch gardens, now being converted into a recreation park, which has left environmentalists very unimpressed.
Until recently, the Mdina ditch was an underutilised ground that was inaccessible to the public, which the Rural Affairs Ministry has tried to change. However, the plan has failed to convince some people.
“This is the work of architects with no background in environmental management. This is vandalism,” said Alfred E. Baldacchino, former assistant director at the Malta Environment and Planning Authority’s environment directorate.
The work includes the uprooting of more than 270 citrus trees lining the bastion walls. About 150 will be replanted a couple of metres across the ditch and the remaining trees will be relocated to Buskett.
“This is not the right time for uprooting. We are in spring, blossoming time. It is a trauma for the trees. There is no guarantee they will survive,” said Mr Baldacchino.
Similarly, environmentalist Antonio Anastasi said on Facebook that if the uprooting had to happen, it should have been done without removing all the trees’ foliage.
Mr Baldacchino questioned the reason for moving them only by a couple of metres, calling it a “sheer waste of money”. The estimated value of the project – to be completed this year – is €1,200,000.
On site, a crane was uprooting the trees to loud pumping music.
“Look at that, all the roots of these citrus trees are sawn off with a chainsaw so that they fit in the new hole. They should at least make the hole bigger,” he said.
The Rural Resources Ministry said any protected species “will be left in place” and the design of the paving will work around them.
A spokesman explained the trees being transplanted to the other side of the counterscarp were being moved to “expose the scale and majesty of the bastions”.
Mr Baldacchino pointed out that citrus trees did not grow tall and could not obstruct the view of the bastions. However, he also
noted that, before being uprooted, the trees were being pruned hastily.


“When you prune, trees ‘weep’. You need to coat them immediately to protect them from insects,” he explained. He also believes that the project does not embrace Maltese biodiversity. “Turf, for example, is not part of the Maltese ecosystem and it’s very expensive to maintain because it needs a lot of watering. We need gardens that highlight the
biodiversity of the place. “Why are we just recreating a Victorian garden?”
The government insists the project includes an “intensive water management exercise” through a water catchment on St Paul’s
bastion. “All the water received during the last year has been diverted toward an existing reservoir in the courtyard of Vilhena Palace,”
a ministry spokesman said.
“This will serve as one of the backup reservoirs for the main reservoir behind the counterscarp in the ditch and may be replenished by bowser during dry seasons.”
The project proposes to collect the greater part of the rainwater run-off in shallow reservoirs that have been creatively designed by taking advantage of the difference in the levels of the grounds.
A Mepa spokesman said all permits were in hand and continuous archaeological monitoring was being carried out during the works.
In the meantime, a petition against the pruning of trees – Save Malta’s Trees – sponsored by columnist Pamela Hansen is doing the rounds online and has already garnered more than 200signatures.

The original article and video in The Times can be seen on:
http://www.timesofmalta.com/articles/view/20120525/local/-Battle-scene-at-Mdina-ditch.421226

See more exchange of views on the Save the Tree group on Facebook
http://www.facebook.com/groups/227850170644983/

Those who want to sign the petititon can do so on:
http://www.thepetitionsite.com/629/494/052/save-maltas-trees/

An old legally protected Olive Tree heavily pruned on the 16th May 2012. A few days later it was uprooted and disappeared.

All the old legally protected Oive Trees in the ditch were heavily pruned and a few days later they were uprooted and all disappeared.

Additional comments by A E Baldacchino

• “About 150 will be replanted a couple of metres across the ditch and the remaining trees will be relocated to Buskett.”
Buskett is small woodland with forest remnants of Holm Oak and Aleppo Pine. It has been declared an EU Natura 2000 site following submission by Government. Despite this the Ministry of Resources and Rural Affairs has been consistently claiming that Buskett is a garden. Buskett is crying for the strengthening of the population of wild trees which once graced this woodland, and which today are on the verge of extinction. Indigenous rare trees which should be planted at Buskett are the Ash, the Bay Tree, Elm, Hawthorn, Mastic Tree, Buckthorn, Poplar, Holm Oak and others. Yet the Minster responsible for landscaping has chosen to plant the uprooted citrus trees from Mdina Ditch at Buskett.
• “The Rural Resources Ministry said any protected species “will be left in place” and the design of the paving will work around them.”
The dozen or so old established protected Olive trees were first heavily pruned. Then one by one, by the 20th May 2012, they were all uprooted and carried away from the site.

The remains of the grove of citrus trees after a substantial number were uprooted to mke way for a ‘garden’. Part of the ditch opposite the bastions is covered by a beautiful cover of Ivy, providing much needed adequate habitat for local fauna. All the greenery is probably waiting for the chain saw to clear it to make way for a ‘garden’. No details as to the future of such natural habitat are availed.

The out of the way sign showing the financial help received room the European Union with regards to the Mdina project.


MASSACRE OF MDINA DITCH TREES – IS THE EU REALLY INVOLVED?

April 30, 2012

29th April, 2012

MASSACRE OF MDINA TREES –

IS THE EU REALLY INVOVLED?

Alfred E. Baldacchino 

A very interesting debate has developed on the site Save the Trees which can be accessed on: http://www.facebook.com/groups/227850170644983/267876579975675/?notif_t=group_activity

An outstanding feature on the above blog is that 99% of the bloggers who love trees and biodiversity are criticising the official persecution and  massacre of trees in the Maltese Islands.  But those who express such concern are taken to task by one particular blogger who clams that he works at ELC.

2012.04.26 - Up till a few days ago, these orange trees where in full bloom

Sometimes I can hardly believe what I read on this blog in defence of the mutilation of trees and biodiversity by ELC. It is to the tune of the official Government  policy on projects relating to biodiversity, despite the electoral promise of an environmental column. Such a blogger says they he is  writing in his own personal capacity, a right which he has and which he can exercise to create such a discussion. Yet details are given which the public is not aware of. This makes one think that ELC is finding it very convenient to let their alleged workers speak for them, and these cannot do otherwise but  laud all ELC’s works of wonder.  They would certainly be shown the back door if they were to write something which the ELC, or their Ministry, does not approve of. They would be charged with conflict of interest  if   they  criticise, even constructively,  the works of their Ministry. And they will surely get the axe if they make a faux pas, even if what they say  might have been suggested to them.

In criticising Ministerial projects, although the EU obliges public consultations on public projects, blogers are called names, accused of not knowing anything about trees and their ‘pruning’ and also accused of belittiling the ELC workers. This still happens, despite the fact that time and time again, all blogers have made it clear  that workers have to do what they are ordered to do and cannot be held accountable for executing the decisions taken by their employers or their Minister.  But this calling of names is something which is now very synonymous  with such quarters.

2012.04.26 - orange trees in full bloom awaiting the chainsaw and the bulldozer!

The ELC is responsible to the Minister of Resource, whom it shields.  The mania about creating gardens in such fashion, is something well known within this Ministry. A few years ago there was an attempt to transform Buskett into a garden!!

A wild Laurel tree at Buskett - an EU Natura 2000 site - mutilated by ELC with Ministerial approval, in the attempt to transform Buskett into a garden, before MEPA intervened and stopped the works.

Everyone knows of the massacre executed at Buskett by ELC with the blessing of their Minister. Now we have the transformation of the Mdina Ditch into a garden, with TURF and fountains as the Save the Tree site  have been informed by  an ELC alleged spokesman.

Uprooting trees to create  a garden….. very hard to believe. Substituting them with  TURF which takes gallons and gallons of water, such a rare resource in the Maltese Islands, especially in the hot summer months.  The paving of straight-line paths furthermore contributed  to the uprooting of  even more trees. This Ministry seems to have a mania with expanses of turf and dancing-water and fountains, like the dancing-water at St. George’s Square in Valletta. And believe it or not, all this  has been approved by a Ministry responsible for the local scarce resource of WATER, and also for Climate change!!  Unbelievable! I am sure that a  spokesman for this Ministry will come up with some crude explanation and possibly with  more calling of names. But one has to accept that some Ministries  are very good at this type of dialogue! It is their forte.

2012.04.06 - The beauty of the Mdina Ditch - a biodiversity haven. Is this going to be cleared away to make room for a garden? And is this going to be undertaken by EU funds as an insider from ELC has indicated?

The reference to EU funds by the ELC alleged-worker in the Save the Trees blog is interesting because it is coming from this semi-official  bloger in favour of this project leading the public to understand that this project is funded by the EU, saying that 85% of the total cost of the €6.2m project is being funded by the EU! This creates and incongruency with the press release issued by the Minister which  said that it was being done by the Minster’s (public) funds “The works are being carried out by the Restoration Directorate of the Ministry for Resources and Rural Affairs.” No mention of EU funds; and “The project, costing  €1,200,000, is due to be completed by the end of this year.”  See the attached link for the official press release: http://www.timesofmalta.com/articles/view/20120406/local/works-start-on-recreation-area-in-mdina-ditch.414277

When I visited the site, I failed to notice any reference to any EU involvement on the site. Now if there are any funds from the EU, one of the obligations is that the EU logo has to appear on all the publicity for the project. There are now two version with reference to the financial input to this project: the Ministerial publicity which refrains from mentioning any EU involvement; and EU funding according to a bloger with ELC connections.  Which is the correct version?  I am sure that the EU would be very interested in knowing  how its funds, if it has funded this project, are being ‘used’ and ‘managed’, what the public opinion vis-a-vis this project is, and how such project is impacting on biodiversity!

According to EU obligations, whether it has financed the project or not, the  public is entitled to a breakdown of the money which is going into this project, such as  how much the turf will cost, the quantity of water it will consume per annun and at what cost; how much will be the upkeep, how much did the planners and designers charge, and how much will the launching of the  project cost.

The lack of any biodiversity and social concept are evidently lacking to any informed visitor. This view is sustained by the comments supporting this project on the Save the Trees  blog: Orange trees are being uprooted because they interfere with the vision of the bastions, but fountains do not! And insects and birds aren’t going to commit suicide, if they do not find a tree, they go on another one, the  Rabat environs are full of trees. ( L-insetti u l-ghasafar mhux ser jaghmlu suwwicidju, jekk ma jsibux sigra, imorru fuq ohra, inhawi tar-Rabat huma mimlija sigar min daqsekk). Not surprising at all since this is the recurring approach used by the Ministry under whose responsibility this project falls!  No wonder that when the same Ministry was responsible for the EU measure to tackle biodiversity loss, it made a complete mess and failure out of it.

The official Ministerial publicity material attached to the bastins, (shown above) states that this project is a Rehabillitation of the ditch. In contrast, the bloger with ELC inside informations states that “The ditch outside Mdina’s bastions from Greek’s gate to Xara Palace including the area below the main gate, is being turned into a recreational space which will be open to the public”. There is a great difference between ‘rehabilitation of the ditch’ and changing its use to a recreational area, especially when the tennis court, the basketball pitch, and the football pitch, which formed part of the ditch to be rehabilitated have been removed.

Somebody is surely trying to take the people for a ride despite the fact that the Prime Minister has promised that he will come closer to the people to listen to what they  have to say…………    I understand that heeding it is another matter!