The Archpriest of Nadur applied for the development of a cemetery on May 20, 2002. An outline development permit was issued on January 28, 2004 and a full development permit, valid for five years, was granted by the Malta Environment and Planning Authority on May 31, 2007. An appeal was submitted by Nature Trust on July 16, 2007 and works on the cemetery started in summer of that same year.

2012.10.00 - works in progress while the appeal keeps being postponed

Work in progress on the cemetery while the appeal board deliberated

The following documented data was made available to the Appeals Board: The development is in an ODZ (outside development zone).

There never was any public consultation.

EU Water Framework Directive obligations regarding ground water were not taken in consideration.

The locality is designated as an area of high landscape sensitivity and a land of agricultural value according to the Gozo and Comino Local Plan.

Technical staff at Mepa repeatedly recommended a refusal for such development.

Refusal was also recommended by the planning authority’s Heritage Advisory Board.

The proposed cemetery lies within the catchment area of one tributary that feeds Wied Għajn Qasab, one of the most important in Gozo.

This 6,500-square-metre cemetery footprint is on upper coralline limestone (garigue), overlying blue clay that contributes to a perched aquifer covering 5.6 square kilometres, “filtering on a good rainy season 16,000 gallons (73,000 litres) of potable natural water daily at Għajn Qasab springs”.

It is estimated that the recharge of water through percolation or infiltration amounts to 785,109 cubic metres annually.

The water catchment area around the cemetery covers 33,000 square metres.

The rock formation contains various faults, crevices and fissures, which channel rainwater to the farmers’ cisterns.

The fields dependent on the aquifer have been used for agricultural purposes for hundreds of years.

The engineering works regarding water use and storage, including bell shaped wells, galleries, channels and cisterns, date back to the time of the Knights of St John. Such network has been physically destroyed or rendered nearly useless by the cemetery.

The report by the geologist appointed by the developer, indicated that the project is unlikely to have an adverse impact on the water resources.

No hydrologist’s report was ever submitted.

The precautionary principle, a guiding principle in the EPA 2011, was completely ignored. The developer reports that the cemetery plans to cater for 643 graves, despite the fact that only 50 persons die annually in Nadur, some of whom are buried in the old cemetery.

The commercial value of the cemetery’s footprint estimates each grave at €4,000 at the time of the submisison of the appeal in 2007, showing the commercial vision of the project.

A number of letters were officially, personally and publicly written to the Prime Minister and to the minister responsible for the environment.

A number of social entities, farmers and the public expressed disapproval both of this development and of the way it was being handled.

The appeal case was heard and postponed for 19 times and, finally, a decision date was appointed for September 27, 2012, only to be postponed again.

The legal representative of the farming community wrote to the Environment and Planning Review Tribunal, emphasising that postponing the decision was jeopardising the interests of the farmers.

A hydrological report by Marco Cremona was eventually presented to the Appeals Tribunal. The study clearly states that there is no doubt about the direct hydraulic connection between the site of the cemetery and the farmers’ water source.

Affidavits by affected farmers show that, before the work on the cemetery, they had enough water for their fields. However, when the works got under way, they had to buy water for their fields and products decreased in quantity and quality.

On March 15, 2013 – the ides of March and six days after the last election – the Environment and Planning Review Tribunal informed the objectors that the original permit dated May 31, 2007 was superseded by another permit dated July 23, 2012, where the applicant presented an amended application to the original permit.

Since there was no appeal to the latter permit, the original one was now exhausted, having been superseded by the latter. Because of this, the tribunal abstained from taking further notice of the appeal.

Mepa’s vision “is to pass onto our children a better country than we inherited. It is for this very reason that we (Mepa) compare our environment to a treasure, something we dedicate our energies to, to protect, care for and improve. The environment encompasses all – nature, cultural and architectural heritage, towns and villages, the countryside, the seas and air. We (Mepa) believe that together we should carefully plan so that our heritage, this gem that we treasure, will not fade away.”

Who can possibly believe this when Mepa buried its vision at the Nadur cemetery?

2009.02.00 - The remains of a protected carob tree

The water catchment area of garigue which replenished the perched aquifer feeding and supplying water to the farming community and the valley ecosystem – BEFORE the approved rape of the ecosystem started.

Was this cemetery, to be run on a time­share basis, really needed in Nadur? Why was the precautionary principle not applied in such a sensitive and delicate ecological area with such a rare natural resource? Why where the above social and ecological negative impacts all cast aside, importance being given only to economic aspects? Was ‘the hand of god’ coerced to give the green light for such an injustice?

Jesus once entered the temple area and drove out all traders and shoppers. He overturned the tables of the money changers and the benches of those selling doves. What would He have done had He found the selling of graves in His name? It is easier to deliver 10 sermons than to live one.

“Our lives end the day we become silent about things that really matter”…“and, in the end, we will remember not the words of our enemies but the silence of our friends” (Martin Luther King).

2009.06.01 water from the acquifer

The murky water feeding the farmers’ cisterns after the work started – definitely not the clear pure potable water they were used to use before.

The dead at Nadur cemetery will haunt and curse the living.

For God’s sake, remove environmental matters from Mepa before the social and ecological fabric of these islands is completely destroyed.

aebaldacchino@gmail.com

alfredbaldacchino.wordpress.com

The original article in The Times, with comments posted by readers, can be seen at the following link:

http://www.timesofmalta.com/articles/view/20130406/opinion/A-vision-buried-at-Nadur-cemetery.464394

Advertisements

TREES – Open letter to the Prime Minister

September 30, 2012

28th September 2012

Dear Prime Minister Dr. Gonzi,

I would like to join Anna Spiteri’s appeal for the protection of the Senglea trees which are intended to be uprooted because of unjustified reasons, when less expensive measures can be taken to manage and incorporate them in the envisaged works. I would also like to add that the recent unprofessional uprooting of established trees which all have a role in the local ecosystem, seems to have run out of control. I have never experienced such misuse and mismanagement of such a natural heritage, done on an official basis, utilising both public and European funds.

Such use of public and European funds is not contributing to any protection, appreciation or to the safeguarding or embellishment of our urban landscape, thus having a drastic negative impact on the social and ecological environment
of the Maltese Islands.

While appreciating that considerable funds are being made available for such ‘landscaping’ and also government’s intervention to acquire European Union’s financial help towards such an aim, I regret to say that the way these resources are being used falls short of expectations and obligations, lacking any professional planning, wise use and proper management of local biodiversity. One cannot be blamed for thinking that the main aim of such activities is just commercial.

As you may be aware, a great number of trees were hacked, uprooted, transported and dumped elsewhere, from areas such as those at Fgura, Żebbuġ, Cospicua, Mdina Ditch, Mellieħa, Luqa, Santa Lucia, Raħal Gdid, Corradino, Marsa, Senglea, San Ġwann, and Victoria and Xewkija in Gozo. More uprooting and removal of trees is planned in connection with the EU TenT-financed project at Salina Road, Kennedy Grove, and the Coast Road, as well as the proposed uprooting of a substantial number of trees, including old Holm Oaks (Ballut) in Floriana and outside Valletta. I would also like to bring to your attention the destruction of indigenous protected trees which were planted by the late Prof. John Borg at San Anton Garden.

As you may also be aware, there is quite a public outcry at this lack of appreciation of local established trees and the complete disregard of public opinion. I am sure that you do agree that the public has a right to be involved in such decisions, a right which unfortunately is not being completely given.

I also regret to have to point out that the precious time, money and publication of local legislation and guidelines with regards to trees and local biodiversity are being ignored, as are the international obligations arising from various international environmental conventions, and the EU Environmental Acquis, also transposed into local legislation.

It is indeed a pity that such scarce resources are not being used and managed in a more professional, open way, both from the economic, ecological and social point of view. There is a great potential with the available resources that could offer more protection for the local biodiversity, a better balance of payment, more local opportunities and jobs in the protection of the local biodiversity, better embellishment of urban areas, the boosting of local environmental education the more so when the general public is crying for such measures. Unfortunately, because of myopic and other commercial reasons, all these are being ignored.

It would indeed be greatly appreciated if you can intervene in the interest of the people and the protection of local biodiversity, and ensure that such commercial activities do not have any negative impact on local biodiversity, that local and European funds are better utilised and better managed, and that the general public is involved in such decisions. After all these are all incorporated in a pre-electoral promise and are also incorporated in EU Environment Acquis obligations.

Regards

Alfred E. Baldacchino

https://alfredbaldacchino.wordpress.com/2012/09/28/qerda-tal-biodiversita-fil-foss-tal-imdina-biex-isir-gnien-ta-kwalita/

SEE ALSO RELATED ARTICLES ON THIS BLOG

https://alfredbaldacchino.wordpress.com/2012/05/25/environmentali…ent-over-trees

https://alfredbaldacchino.wordpress.com/2012/07/31/once-there-were-green-leaves/

https://alfredbaldacchino.wordpress.com/2012/04/30/massacre-of-md…eally-involved/

https://alfredbaldacchino.wordpress.com/2012/02/27/government-policy-on-trees/


Green dream and black nightmare

August 10, 2012

Friday,  August 10, 2012

Alfred E. Baldacchino

Green dream and black nightmare

During his short term responsible for the environment, both as junior minister and later, as minister, Mario de Marco has published a number of laws and policies.

Some he moved through Parliament, such as the National Environment Policy (NEP) and the Sustainable Development Act. Other guidelines and policies were published by his environmental watchdog, the Malta Environment and Planning Authority.

These included the National Biodiversity Strategy and Action Plan and the new guidelines for the management of invasive plants. These supplemented the guidelines on trees, shrubs and plants for planting and landscaping and the tree protection regulations.

The above are some of the Government’s publications: all official administrative and legislative tools which can definitely make any green dream a reality. But why are they ignored by Government itself? I cannot image that these have been published just for the attention of  the EU and its Member States. Or that these publications are meant to take the public for a ride? Then why are these ignored and not enforced?

Unfortunately, the enforcement and implementation of these laws and regulations leave much to be desired.

The three pillars for conserving biodiversity and ecosystem services as defined in the NEP are all addressed in the above. These provide direction to all players in this field, ensure policy integration and enable stakeholders to work in a coordinated manner to achieve the national objectives and key priorities.

All aim at improving the status of biodiversity by safeguarding ecosystems, species and genetic diversity as well as easing pressures on biodiversity and promoting sustainable use.

Furthermore, these guidelines and regulations highlight the collaboration and commitment of all relevant stakeholders to achieve the strategic goals of the NEP and to empower people to actively participate in environmental management and take action on environmental issues.

An important policy in the NEP is that the government, in promoting environmentally-friendly actions, should lead by example.

Definitely not according to the guidelines and regulations referred to above!

Notwithstanding the above, the wave of criticism on the mismanagement of trees and the misuse of public funds in “landscaping” is gaining momentum.

Facebook groups have been set up, initiatives promoting the protection of trees have been taken and articles and letters in the press express the disappointment of such mismanagement. Yet, the government, through one, or at best, two of its ministers, still bulldozes on, irrespective of the people’s comments, criticism and suggestions. If, before the last election, the Prime Minster did not declare that the environment was one of the government’s three main pillars and if he did not lately say that he was ready to listen to the people in the national interest (even in the kitchen, if necessary, as I am told) one could comfortably say that the government does not have any special interest in the environment.

But, the way environment is being mismanaged makes one conclude that there is no such real interest and no such will. The social and ecological values are completely gobbled up by commercial interests with political blessing.

The Times (September 6, 2011) titled a report on the launching of the national environment policy thus: PM Launches Green Dream. There are many, many in this country who have such a green dream. Great things were conceived as little dreams. If Martin Luther King did not have a dream and persisted with determination there would not be a Barack Obama today. But to achieve a dream, one has to persist with determination in one’s vision and not ignore, or endorse, activities that are diametrically opposite to it.

The latest “landscaping projects” financed by the government are those of Mdina ditch, where about 400 trees were uprooted, surprisingly to make way for a garden. Trees at the Mellieħa old bus-terminus were all uprooted for others to be planted instead. Lately, the destruction of trees in part of Triq Diċembru 13, Marsa, hit the headlines. Some of the trees were removed on grounds that they are invasive!

Surprisingly, at the same time, another minister is endorsing plans and funds for the planting of Fountain Grass, Brazilian pepper tree, the Australian Pine tree (Casuarina) and the Hottentot fig – all aliens and invasive species.

Once again, the BSS (Bisazza Street Syndrome, which was conceived in Bisazza Street, Sliema) is again raising its ugly head with the same political players, leaving the Minster for the Environment speechless.

BSS did strike again with regard to the Rabat Road rubble walls (which now have been replaced by iron railings against all policies and regulations – Mepa please note). Now, BSS has infected the government’s so-called landscaping projects, defying, ignoring and ridiculing the above national regulations and policies, suppressing and pushing aside all active participation of the people.

What is very worrying is the fact that such “landscaping” is being done with public funds, some even with EU funds. And some are also completely against mitigation strategies regarding the government’s stand on climate change and water policy, which, incidentally, fall within the same ministerial portfolio.

The Prime Minister may have an admirable green dream. The majority of the people yearn for the fulfilment of such a conceived green dream. But, the government’s plans and projects are rendering the Prime Minister’s green dream a bizarre black nightmare, a nightmare that will haunt the political players all their lives and beyond. Not that anybody of them cares, I presume! But can the Prime Minister please intervene to achieve his and our collective green dream?

aebaldacchino@gmail.com

PS  – Photos were added to this post and do not appear in the original article in The Times

See also:

https://alfredbaldacchino.wordpress.com/2012/07/31/once-there-were-green-leaves/

https://alfredbaldacchino.wordpress.com/2012/05/25/environmentalists-vs-government-over-trees/