Political environmental awareness reached its climax in 2004 before accession to the EU. Membership achieved, environment started a political nose­dive. ‘Merged’ with the Planning Authority, it was hijacked, destabilised and emarginated. Look at how environmental matters are being handled today by MEPA, politically referred to only just for convenience sake with no conviction at all. This led nine environment NGOs to show their disapproval of the lack of professional management of the environment.

2013 can be regarded as the year when environment disorientation reached its peak, and environment conservation hit rock bottom. To the extent that MEPA ­ the competent authority for the EU Environment Acquis is not within the control and not in the portfolio of the Minister for the Environment, but managed and run by the Office of the Prime Minister, through a Parliamentary Secretary.  MEPA, who never really showed any zeal or understanding of environmental responsibilities, except for producing nicely coloured publications and policies, which nobody takes any notice of, not even Mepa itself, had a field day. Stable doors were flung wide open allowing horses not only to gallop out but to stampede over all environmental and social considerations. Reason for this sad and sorry state of affairs is that the environment and planning directorates are going to be separated. All environmental matters are in deep freeze, till the day, when the surgical operation of dismembering Mepa will see the light of day. In the meantime development permits are being dished out with little, if any, environmental or social concern. When the environment is given the kiss of life, then it won’t be MEPA problem any more to see how the vacated stables door can be closed to keep the freed horse inside.

Why was MEPA not included in the environment portfolio until the operation takes place, and then the planning directorate passed to the appropriate Minister? Because environment is not a priority. It never was.

WFD1

One of the expensive muddles regarding EU obligations is the Water Framework Directive: not an easy Directive by all means, the more so since Malta is an island. This Directive covers both surface, and underground water: a matter of life and death for all life in the country. 2013 saw this resource in such a pitiful state as it has never been since the advent of man on these islands. Projects inherited from previous water-drop1years, included an educational programme piloted by one Minister and sponsored by a local bank to catch every drop of water, while another Minister happily boasting and spending 57 million euros or more, mostly coming from the EU, excavating underground tunnels so that every drop of rain­water caught is swept into the sea, after bulldozing biodiversity in valleys. Yet another Minister responsible for EU funds to see to the purification of drainage water, not to harvest such resource, but to dispose of it into the sea with a certain pride and satisfaction of

dumped-water

Rain water which comes for free is chanelled to the sea. Then sea water is pumped up to be desalinated by energy consuming desalinators!

being unique in the EU! Still another Minister trying to find his way through an inherited tangled cobweb, trying to plug the holes through which water tankers plying the local streets, selling water extracted for free from the aquifers. Another Minister is financing the desalination of sea water (containing dumped purified drainage water) by energy consuming desalination plants. I cannot not mention water park, the dancing fountains and the expanses of turf being laid, taking gallons and gallons of water sprinkled everyday with the approval of the Ministry for landscaping. And a postponed and postponed national water policy, in the face of a possible EU infraction.  Great Political management of the environment! Shall we soon be singing ring a ring o’roses? God forbid.

“Environment destruction is turning our lives upside-down”

The monument for environmental and social destruction during 2013, without doubt was the Nadur cemetery in Gozo; built on a priceless ecological water catchment area, destroying works of the Knights to harvest rain water, and putting the ecosystem and the life of a farming community in danger, by depriving them of water and by flooding other farmers’ fields because of the hydrological changes in the area. A 600­ grave cemetery to be run on a time share basis blessed by that Competent Authority for the Environment, MEPA; blessed by the local politicians; helped by the Environment and Planning Review Tribunal who like Pontius Pilate washed its hands from such a catastrophic social and environmental crime; and developed, built and blessed by the Gozo Church Diocese. A cemetery whose first intakes were Mepa’s and

epitaph_name_Tomb1

the Gozo Diocese’s environmental and social conscience. Only God can forgive such an environmental and social crime, approved in 2013. To add insult to injury, this happened in Eco ­Gozo, cementing the lip service for ecological protection and the lack of understanding of biodiversity.

eco-1

The good thing about environment in 2013 is that I have run out of space, and cannot delve deeper on the proposed changes to the Outside Development Zones, and Structure Plan; the Xemxija scandalous planning decision, biodiversity loss and the invasion of alien species, and other policies in the pipeline in favour of further myopic development, such as land reclamation, Hondoq ir-Rummien, the Malta-­Gozo tunnel both in Eco Gozo, all burdening the environment and society with more hidden costs and destruction.

What of 2014 one might ask? Following the liaise-faire in environmental and social awareness by politicians and other social entities since accession to the EU, one can only say that environmentalists, socialists and nationalists (nothing to do with politicians) atheists and believers alike, would better fasten their seat belts. Past decisions can only reflect further destruction of the environmental and social fabric, rendering our country a difficult and unhealthy place to live in. The momentum of these negative impacts on society and the environment can already be seen and felt. Development and money matters are holding the political decision makers of this country at gun point, at a cost to the environment and society.

times 1

Photo and caption in the Times: Changes burdening the environment and society with more hidden costs and destruction were also proposed for Eco-Gozo. Photo: viewingmalta.com

Every time I get to think about this, with every thought of where all this will lead us to, makes me feel that I can’t tell the bottom from the top. Am I standing on my head or on my heels? Is it cloudy is it bright? Is it day or is it night? Am I wrong or am I right? And is it real?

Environment destruction is turning our living upside-down. But why cannot this country ever grow up?

I have as yet refrained from answering my question as to whether all this is sheer inexperience in good governance, or a shrewd diabolical political psychology.

aebaldacchino@gmail.com

You may also wish to see: 

http://wp.me/pL6Mk-sb
http://wp.me/pL6Mk-62
http://wp.me/pL6Mk-nw
Advertisements

From nature study to biodiversity

July 9, 2013

times

Tuesday, July 9, 2013

From nature study to biodiversity

 Alfred E. Baldacchino

When we were young, we used to be taught nature study: by collecting tadpoles in jam jars and pinning butterflies on pieces of cork. Eventually, this changed to a wider vision of environmental studies. Following accession to international conventions and the European Union, a more sophisticated word is used: biodiversity.

Biodiversity is the amalgamation of the words biology and diversity. It means the variability among living organisms from all sources including, inter alia, terrestrial, marine and other aquatic ecosystems, and the ecological complexes of which they are part.

All living organisms (biotic) need adequate physical environment (abiotic) such as land, air, light and water to live and procreate. Biotic and abiotic form a delicate dynamic balance sustaining all life: the complex of plant, animal and micro-organism communities and their non-living environment interacting as a functional unit. Such diversity within and between species and ecosystems essentially is a synonym of ‘life on earth’.

biodiversity

Graphic image of biodiversity

Another principle related to biodiversity is its sustainable use: the use of components of biological diversity in a way and at a rate that does not lead to the long-term decline of biological diversity, thereby maintaining its potential to meet the needs and the aspirations of present and future generations. It has ecological, economic and social dimensions.

The reconciliation of environmental, social equity and economic demands are referred to as the ‘three pillars’ – if ‘pillars’ are anything to go by locally.

Human_Sustainability_Confluence_Diagram

The three pillars of sustainability

Such a concept of life on earth is not always accepted by some sections of the self-proclaimed most intelligent species on earth, – homo sapiens, maintaining that such an intelligent species cannot be subject to such a natural system. Such ‘sceptics’ are mostly found among commercial, political and even religious entities.

Senior citizens remember days when we used to drink out of any streamlet or cistern without any fear or health worries. There was no acute asthma or coughing problems that have become so common and are normal background sounds to any public gathering.

Summer was warm months; winter was cold months and there was never any thought of sudden climate change and its impact on living organisms.

Occasionally, I try to image the modern way of life in the biblical Garden of Eden. Not only would the self-declared most intelligent species swoop on the forbidden fruit, some with the sole intent of genetically modifying it to make it better and feed the people, but the slightest vision of a Eurodollar-clad serpent would create a stampede to approach and eventually take possession of the fruit, uproot the tree and replace it by an investment yielding  maximum financial profits.

The early 1970s saw a crescendo of local waves of publicwide communication, education and public awareness on specific species, initially birds and later trees. Such was the impact that it led some politicians, past and present, to conclude that there were those who thought the environment was just development, birds or trees. I have heard this more than once from different coloured quarters.

A couple of days ago,a group of ecoskola students were convened in Parliament, where they also addressed members of the House of Representatives. Their message relating to ‘caring for our future’ focused mainly on fostering further awareness on the importance of environmentally sustainable policy.

Some politicians, the world over, have managed to coin their own ‘political’ definition of technical words, not necessary in the context or in line with scientific jargon. The latest political definition of sustainability is sometimes development has the upper hand, while sometimes the environment does. If this definition was applied to a football league, it would perhaps be close to acceptance. But applying this to sustainable use of biodiversity qualifies it for the best political joke of the year. It simply means sustainable use of biodiversity is far from being understood and biodiversity is on the development chopping board.

Malta is party to the Convention on Biological Diversity and also forms part of the European Union. Ignoring and failing to understand and implement such concepts of biodiversity can never place any country high up in EU rankings: it can only place it on top of the infraction list.

During the past decade, biodiversity has been the Cinderella of government, misunderstood and mismanaged even by the competent authority established for its very protection: Mepa.

A brief, backward look at Buskett, Dwejra and RamlaBay in ecoGozo, and Għajn Tuffieħa, all EU Natura 2000 sites, shows the disinterest and laissez-faire towards biodiversity.

Such lack of interest, the newly coined political definitions, the splash of fireworks to make us different, extinguish any hopeful light at the end of the tunnel for the better management, protection, enforcement and appreciation of Maltese biodiversity.

The national and international obligations for the protection of biodiversity go much further than just protecting birds or trees from development.

But if schoolchildren can understand and embrace the real meaning of biodiversity, why can’t politicians? After all politicians are intelligent and honourable men, unless they themselves disagree with such public perception.


Red Palm Weevil invades eco-Gozo

June 1, 2013

times

Saturday,1 June, 2013

Weevil invades eco-Gozo

Alfred E. Baldacchino

 

The red palm weevil first set foot in the Maltese Islands in 2007.  Despite the expanse of the natural adequate sea barrier preventing this weevil from crossing over to the Maltese Islands – it can only fly a distance of one kilometre – it did manage to get a free ride on infected palm trees imported from Egypt and Europe.

The bad news was relayed through a press release issued on 24 October 2007, by the Ministry for Rural Affairs and the Environment informing the public of the Red Palm Red-Palm-WeevilWeevil’s presence in Malta. It quickly established itself and from St. Paul’s Bay, where the infected trees were housed, it spread to Salini, Qawra, Mosta, Attard, Mtafra, Rabat, Siġġiewi, Żebbuġ, Luqa: in a short spell it spread all over the island of Malta.

The transportation of palm trees to Gozo was immediately withheld. The expanse of sea between the islands also served as a natural barrier preventing its dispersal.

A parliamentary question dated 25 March 2009, revealed that 310 palm trees were uprooted in Malta. These consisted of 121 from public places and 189 from private gardens. This year, on the 5 May, another parliamentary question further revealed that during the first four months of 2013, a total of 248 palm trees infected by the Red Palm Weevil, were uprooted in Malta.

From 2008 to 2013, the total number of palm trees officially uprooted is 558: the result of the mismanagement of Maltese biodiversity, reflecting the hidden costs paid by society and the ecosystem.

I was under the impression (up to Sunday, 21 May 2013) that the Red Palm Weevil was prevented from invading Gozo, and palm trees there were safe. It was on these thoughts that I expressed myself during a comment on the Red Palm Weevil on the national TV station news bulletin. But my optimism was short lived.

No sooner had the news been transmitted than a Gozitan friend of mine phoned to inform me that the red palm weevil had officially established itself in Gozo since September 2012, despite the fact that trees landing at Imgarr Gozo are monitored.

On the morrow, another Gozitan friend contacted me to tell me that a relative of his had some palm trees on his land, which trees had also been attacked by the red palm weevil.

To add insult to injury, after reporting such infected trees, he was given a warning from the Ministry of Rural Affairs and the Environment, that if the infected trees were not uprooted in a couple of days he would be heavily fined to the tune of €666.66!

Why has the invasion of eco-Gozo by the red palm weevil been kept a secret to this day? Why were the Gozitans not informed of the invasion by this introduced weevil, so that they could take any precautionary measures they deemed necessary?

Before I am so rudely reminded, I do recall that since the invasion of eco-Gozo by the red palm weevil, there was a general election!

2008.10.05---larvae-2

The larva of the Red Palm Weevil

Imported alien species all carry a hidden cost, no matter what politicians, entrepreneurs or public officials say or think.

And while landscapers cash on quick profits, and politicians gloat on the number of imported trees and flowers planted, and prime ministers tour ecological time bombs, the hidden cost is borne by society and the ecosystem.

Such burden is becoming heavier and heavier. Great Britain, an island, spends £3 billion annually to control three invasive fresh water species. The EU, the largest importer of alien species, spends €16 billion annually to control the negative impacts of invasive alien species. Brussels has belatedly realised that the free movement of goods with regards to living species, whether flora or fauna, is playing with a very expensive time bomb.

2008.10.05---larvae

The larva of the Red Palm Weevil at work

One hopes that Government will not follow the path of its predecessor, and will immediately intervene and take action.

The red palm weevil is just a living example. There are other invasive alien species, some which have already made their mark and issued invoices, such as the geranium bronze butterfly, the mulberry long horned beetle, the Asian tiger mosquito, while others are still building on their populations before their impact is felt and seen, such as the number of land snails slowly but surely dispersing outwards from their nurseries.

2008.02.03---weevil-cocoons-

Cocoons of the Red Palm Weevil spun by the larvae, before they emerge as adult weevils

Social and ecological considerations are not even factored in the maximisation of profits of such businesses, which up to the ides of March 2013 had political backing.

The bottom line is that eco-Gozo, and Malta, despite obligatory phytosanitary certificates, political half-baked measures, colourful publications, and national and international legal obligations, have been invaded by an alien species despite persistent warnings. 

Gozo is such a small island that the red palm weevil won’t have any problem infesting each and every palm tree there.

Furthermore, it is not that difficult – if there is the will – to trace where new palm trees have been planted.

2008.02.03---ther-works-of-the-Red-Palm-Weevil-larva

The fatal works of the Red Palm Weevil

Along with habitat destruction, over-exploitation, and the domino effect of extinction of species, Pulitzer Prize-winning scientist Jared Diamond has included invasive species as one of the “Four Horsemen” of this ecological apocalypse.

2008.01.15---dead-palm-tree-at-Imtarfa

One of the 600 dead palm trees killed by the Red Palm Weevil at Mtarfa. Who’s paying for the damages?

Eco-Gozo and the Maltese ecosystem now have to pay through their noses for such self inflicted political mismanagement and for ignoring national and international obligations showing the complete failure of virtual eco-Gozo and the once environmental pillar.

Will this apocalypse horse gallop on unbridled, spurred by financial greed?

aebaldacchino@gmail.com

alfredbaldacchino.wordpress.com

See also

https://alfredbaldacchino.wordpress.com/2010/07/25/the-red-palm-weevil-another-alien-species/

https://alfredbaldacchino.wordpress.com/2012/10/29/eu-stand-on-invasive-species/

https://alfredbaldacchino.wordpress.com/2010/06/21/the-introduction-of-alien-species-into-the-natural-environment-%E2%80%93-a-european-concern/


A vision buried at Nadur cemetery

April 6, 2013

times

Saturday, April 6, 2013

A vision buried at Nadur cemetery

Alfred E. Baldacchino

The Archpriest of Nadur applied for the development of a cemetery on May 20, 2002. An outline development permit was issued on January 28, 2004 and a full development permit, valid for five years, was granted by the Malta Environment and Planning Authority on May 31, 2007. An appeal was submitted by Nature Trust on July 16, 2007 and works on the cemetery started in summer of that same year.

2012.10.00 - works in progress while the appeal keeps being postponed

Work in progress on the cemetery while the appeal board deliberated

The following documented data was made available to the Appeals Board: The development is in an ODZ (outside development zone).

There never was any public consultation.

EU Water Framework Directive obligations regarding ground water were not taken in consideration.

The locality is designated as an area of high landscape sensitivity and a land of agricultural value according to the Gozo and Comino Local Plan.

Technical staff at Mepa repeatedly recommended a refusal for such development.

Refusal was also recommended by the planning authority’s Heritage Advisory Board.

The proposed cemetery lies within the catchment area of one tributary that feeds Wied Għajn Qasab, one of the most important in Gozo.

This 6,500-square-metre cemetery footprint is on upper coralline limestone (garigue), overlying blue clay that contributes to a perched aquifer covering 5.6 square kilometres, “filtering on a good rainy season 16,000 gallons (73,000 litres) of potable natural water daily at Għajn Qasab springs”.

It is estimated that the recharge of water through percolation or infiltration amounts to 785,109 cubic metres annually.

The water catchment area around the cemetery covers 33,000 square metres.

The rock formation contains various faults, crevices and fissures, which channel rainwater to the farmers’ cisterns.

The fields dependent on the aquifer have been used for agricultural purposes for hundreds of years.

The engineering works regarding water use and storage, including bell shaped wells, galleries, channels and cisterns, date back to the time of the Knights of St John. Such network has been physically destroyed or rendered nearly useless by the cemetery.

The report by the geologist appointed by the developer, indicated that the project is unlikely to have an adverse impact on the water resources.

No hydrologist’s report was ever submitted.

The precautionary principle, a guiding principle in the EPA 2011, was completely ignored. The developer reports that the cemetery plans to cater for 643 graves, despite the fact that only 50 persons die annually in Nadur, some of whom are buried in the old cemetery.

The commercial value of the cemetery’s footprint estimates each grave at €4,000 at the time of the submisison of the appeal in 2007, showing the commercial vision of the project.

A number of letters were officially, personally and publicly written to the Prime Minister and to the minister responsible for the environment.

A number of social entities, farmers and the public expressed disapproval both of this development and of the way it was being handled.

The appeal case was heard and postponed for 19 times and, finally, a decision date was appointed for September 27, 2012, only to be postponed again.

The legal representative of the farming community wrote to the Environment and Planning Review Tribunal, emphasising that postponing the decision was jeopardising the interests of the farmers.

A hydrological report by Marco Cremona was eventually presented to the Appeals Tribunal. The study clearly states that there is no doubt about the direct hydraulic connection between the site of the cemetery and the farmers’ water source.

Affidavits by affected farmers show that, before the work on the cemetery, they had enough water for their fields. However, when the works got under way, they had to buy water for their fields and products decreased in quantity and quality.

On March 15, 2013 – the ides of March and six days after the last election – the Environment and Planning Review Tribunal informed the objectors that the original permit dated May 31, 2007 was superseded by another permit dated July 23, 2012, where the applicant presented an amended application to the original permit.

Since there was no appeal to the latter permit, the original one was now exhausted, having been superseded by the latter. Because of this, the tribunal abstained from taking further notice of the appeal.

Mepa’s vision “is to pass onto our children a better country than we inherited. It is for this very reason that we (Mepa) compare our environment to a treasure, something we dedicate our energies to, to protect, care for and improve. The environment encompasses all – nature, cultural and architectural heritage, towns and villages, the countryside, the seas and air. We (Mepa) believe that together we should carefully plan so that our heritage, this gem that we treasure, will not fade away.”

Who can possibly believe this when Mepa buried its vision at the Nadur cemetery?

2009.02.00 - The remains of a protected carob tree

The water catchment area of garigue which replenished the perched aquifer feeding and supplying water to the farming community and the valley ecosystem – BEFORE the approved rape of the ecosystem started.

Was this cemetery, to be run on a time­share basis, really needed in Nadur? Why was the precautionary principle not applied in such a sensitive and delicate ecological area with such a rare natural resource? Why where the above social and ecological negative impacts all cast aside, importance being given only to economic aspects? Was ‘the hand of god’ coerced to give the green light for such an injustice?

Jesus once entered the temple area and drove out all traders and shoppers. He overturned the tables of the money changers and the benches of those selling doves. What would He have done had He found the selling of graves in His name? It is easier to deliver 10 sermons than to live one.

“Our lives end the day we become silent about things that really matter”…“and, in the end, we will remember not the words of our enemies but the silence of our friends” (Martin Luther King).

2009.06.01 water from the acquifer

The murky water feeding the farmers’ cisterns after the work started – definitely not the clear pure potable water they were used to use before.

The dead at Nadur cemetery will haunt and curse the living.

For God’s sake, remove environmental matters from Mepa before the social and ecological fabric of these islands is completely destroyed.

aebaldacchino@gmail.com

alfredbaldacchino.wordpress.com

The original article in The Times, with comments posted by readers, can be seen at the following link:

http://www.timesofmalta.com/articles/view/20130406/opinion/A-vision-buried-at-Nadur-cemetery.464394


That business-as-usual stand

January 15, 2011

Saturday, 15th January 2011

That business-as-usual stand

Alfred E. Baldacchino

The conservation and sustainable use of biodiversity was first discussed at length at the Earth summit in Rio de Janeiro in 1992 giving birth to the Convention on Biological Diversity, today having 193 parties. The European Union, a party to theConvention, in a 2001 summit initiated ambitious commitments agreed upon by heads of state and of government to halt the loss of biodiversity in the EU by the end of 2010. This became one of the main targets for managing and conservingnatural resources and was later endorsed by the United Nations World Summit on Sustainable Development in 2002.To achieve such targets and put biodiversity on course to recovery, the EU, in 2006, approved a detailed action plan, aiming primarily to clarify responsibilities concerning the implementation of legislation already in place. As a sign of further support, in 2007, the UN declared 2010 as the International Year for Biological Diversity. The UN Secretary General Ban Ki-moon stressed that “business as usual is not an option” and that “new targets and a new vision is indeed urgentlyneeded”. Such concept was elaborated in September 2010 at a high-level meeting of the UN with the participation of heads of state and of government.

The IYB’s main aim is to raise awareness on the importance of biodiversity with a view of engaging all stakeholders for protecting life on earth, to influence decision-makers and to raise biological diversity to the top of the political agenda. Everyone has to do one’s part. It is unacceptable not to take immediate and effective action. There cannot be a new vision excluding stakeholders. Only such a broad-based partnership, commitment, cooperation, coordination andcommunication can ensure life can continue to flourish on this planet for the benefit of species, naturally including humankind. This is the only way a commitment can be acquired to reinforce the implementation of the Convention on Biological Diversity. An evaluation report has to be submitted to the UN General Assembly in 2011.

As a member state of the CBD, the UN and the EU, Malta is bound by all these commitments. What were Malta’scontributions towards halting biodiversity loss? Apart from the official periodic educational snippets, on the line of what environmental NGOs used to do more than 40 years ago, there is little one can highlight except for the occasional declaration of a protected area without any follow-up whatsoever. On the other hand, however, there is, unfortunately, quite a long list of decisions, actions or lack of them, which not only did not contribute to the prevention of biological loss but had a completely diametrically opposite effect. Considering the source of such negative impacts on biodiversity, this shows the importance of Mr Ban’s emphasis that “business asusual is not an option” and that “new targets and a new vision is indeed urgently needed”.

An off-the-cuff glance at some local “contributions” is a sine qua non. What comes to mind first is the number of alien invasive species that established themselves in the wild these last few years. Some have already managed to prove very costly not only economically but also ecologically and socially. Some of these introductions, albeit not all intentional but all due to lack of any foresight, include the red palm weevil, geranium bronze butterfly, the mulberry longhorn beetle, the tomato leaf miner, the Levantine water frog and about a dozen molluscs(snails) spreading from around some garden centres. Others might not have yet made an impact but when they do it will be too late for any action.

Climate change increases additional costs to control IAS. Britain spends £1.7 billion a year and EU costs amount to about €12 billion. No official figures are available for Malta despite the fact that IAS’s negative impacts are becoming more widespread. And the importation of flora and fauna, the main carriers of IAS,  goes on without any hindrance at all,  except, perhaps, for a phytosanitary/veterinary certificate on which some IAS have travelled.

More of a concern is the fact that the authority responsible to control and eliminate such IAS hinted at the possible intoxication of a fresh water pool to eliminate an alien frog in eco- Gozo. Much the same like advice from Josef Fritzl on how to protect children from sex abuse!

Still very unfortunate were development permits (none related to the management of the areas) issued inside EU Natura 2000 sites. A quick recollection reveals Mistra, Baħrija, and Dwejra – again in eco-Gozo. And, naturally, Buskett, another Natura 2000 site, saved by the skin of its teeth from becoming a public garden where, possibly, pansies and geraniums would have joined the numbers of IAS at this site.The business-as-usual stand adopted by Malta in international fora on the listing of the bluefin tuna in the Convention of International Trade in Endangered Species of  Wild Flora and Fauna and against adjusted quotas, both raised within the EU, is perhaps the cherry on the IYB’s cake.  Mr Ban’s emphasis that “business as usual is not an option” and that “new targets and a new vision is indeed urgently needed” seem specifically coined for the political fraternity.

The year 2010 has come and gone and with it a number of species of wild flora and fauna, which either gave up the ghost in the year of deliverance or else have been pushed to the brink of doing so. The target date has now been extended to 2020. By that time, today’s actors’ names will be engraved in stone – as a reminder of who was accountable for preventing biodiversity loss by 2010.


Behold, the promised Eco-Gozo

December 14, 2010

Tuesday, 14th December 2010

Behold, the promised Eco-Gozo

Alfred E. Baldacchino

I  must admit that Eco-Gozo was a brilliant idea. The launching of this bright idea, however, lacked adequate communication, education and public awareness and cannot be said to be that brilliant.  Stakeholders did not have enough chance to meet to discuss, to suggest and to feel part of this concept. Public consultations lacked any brilliancy. All subsequent development, in its widest sense, does not necessarily dovetail in this concept and is indeed bizarre, to say the least.

Gozo is a small island, endowed with a topography and a geology that make it a unique ecological gem. But, because of its smallness, every mismanaged and short-sighted development has drastic effects on its ecosystem, defying the whole Eco-Gozo concept.

Just a few examples would suffice to show how this concept is unfortunately being torpedoed, with the official blessing of the same authority that should be in the forefront to stop them.

Wied il-Qasab, meandering from Nadur to Ramla l-Ħamra, is fed by natural springs, originating from the upper garigue. The water percolates down through the strata to the valley bed, sustaining both the valley ecosystem and cultivated fields. A short-sighted permit issued against all technical advice saw the excavation of the water source, devastating historical planning techniques dating back to the times of the Knights, shattering bell-shaped wells that stored precious water resources, eventually cutting off one of the valley springs, while negatively impacting the others. All for the sake of a cemetery, where the dead, directly and indirectly, will now contribute to the destruction of this part of Eco- Gozo.

Dwejra is one of the landmarks of Eco-Gozo.  Looking through the azure window reveals the Mediterranean culture, biodiversity and history. Dwejra is a special area of conservation, part of the EU Natura 2000 network, also proposed as an International Heritage Site. A few weeks ago, Dwejra was made to play prostitute in exchange for economic gain. Tom, Dick and Harry were officially assured that there was no ecosystem in this part of the SAC. They were also lectured on the fact that if the economy does well, the environment usually does better. A couple of horses were eventually filmed trotting on the quarry-sand covering the fossil-rich rocks, with the azure window in the background. The covering of sand sent the eco-sensitive public in a rage, seeing the authority who should have ensured that this did not happen, giving its official blessings. Another under-the-belt blow for Eco-Gozo.

This is the International Year of Biodiversity. Someone, a few weeks back, had another “brilliant” idea for this eco-island – to clean the valleys. With myopic ingenuity, devoid of any ecological sensitivity, and of any environmental management, the Marsalforn Valley was bulldozed.  By all means, let the valleys be cleaned to be in a better position to hold more water, as they used to do in the distant past. But for heaven’s sake this is not the way: descending on valleys and destroying all ecosystems in the bulldozers’ path. The end does not justify the means. The valleys have been neglected, abused and mismanaged for so long.

The bottom line again was the economic gain – time-wise at the expense of social and ecological expense. Who would think of using a bulldozer in St John’s Co-Cathedral to clean the accumulated dust in every nook and cranny and so save on time and expense?

eco-scars and eco-wounds

The extant indigenous protected mature trees in the said valley show the scars and wounds left behind, some with exposed and mutilated roots, in a bed now devoid of species that once flourished in the valley ecosystem. The saplings are all gone. Once, there was an authority that used to protect the environment and would have issued permits with conditions regarding such work in delicate ecosystems.  It also used to monitor the works to ensure no damage was done.

It would not be surprising if Tom, Dick and Harry are again informed that, if the economy does well, the environment will do better and there was no ecosystem in the path of bulldozers.  From the economic short-term point of view, the aim might have been achieved but the social and environmental accounts now show an alarming deficit. Another Eco-Gozo concept sunk beneath the waves. Another case of missing the wood for the trees.

The next step towards the concept of Eco-Gozo now seems to be the proposed development of that idyllic place Ħondoq ir-Rummien. Will the authority that used to protect the environment be taken in by the great financial glitter and dismiss the fragile, little understood and uncared for social and environmental unique values?  Will Tom Dick and Harry be told again such a financial economic weight will raise the social and environmental (deficit) sky-high, which will definitely contribute to the Eco-Gozo myth?

The brilliant idea of an ecological island seems to be slowly but surely fading away into extinction, like so many indigenous species. Eco-Gozo can only bear fruit if the entities that cannot and do not want to take into consideration the social and environmental wealth keep their hands off Gozo.

One is now bound to ask:  Is it Eco-Gozo … or Ecce Gozo?